Project Reference List

*************************************************************************************

California State University- Fullerton Little Theatre

Fullerton, CA
Ruzika Company (949.253.9479)
California State University – Sergio Rodriquez (657.278.2122)
August, 2014
Demolition and Replacement of Counterweight Sets, Winches, Controls Upgraded
*************************************************************************************

SUNY Plattsburgh Hartman Theatre

Plattsburgh, NY
Scheu Consulting Services (315.510.3368)
State University of NY – Joe Tesoriere (518.564.4604)
August 2014
Replace 40 each Existing Counterweight sets with Brickhouse Rigging system, 3 Motorized Lineshafts
*************************************************************************************

Blair Taylor K-12 School

Blair, WI
TCI Architects, Engineers, Contractors, Inc. – Matt Grogel  (608.781.5700)
October, 2014
4 each Motorized Rigging Sets, 15 Dead Hung Sets, Stage Lighting and Controls Sound System
*************************************************************************************

El Camino High School – Truax Theatre

Oceanside, CA
John Sergio Fisher Associates (JSFA)   John Fisher (818.344.3045)
Oceanside Unified School District – Beck Markopoulos (760.966.4083)
August 2014
20 each Counterweight Rigging Sets, Fire Curtain
*************************************************************************************

Knoxville High School

Knoxville, IL
Bill Connor Associates (708.437.0505)
Williams Brothers Construction, Inc., Daryl Negley   (309.688.0416)        
June, 2014
10 Dead Hung Sets, Curtains and Tracks
*************************************************************************************

Becker High School

Becker, MN
Schuler Shook, Michael Burgoyne (612) 339-5958)
W. Gohman Construction, Denis Anderson (320.363.7781)          
June, 2014         
Counterweight Rigging, Clew Winches, Pit Filler, Drapes and Track
*************************************************************************************

Franklin High School

Franklin, WI
CG Schmidt Inc. – Brad Fierst  (414.577.1177)
August, 2014
29 Brickhouse Counterweight Sets, 3 each ETC Prodigy Sets, Curtain, Tracks, Orchestra Shell, Pit Filler
*************************************************************************************

University of Southern California

Los Angeles, CA
CSI Electrical Contractors – David Kang (562.946.0700)
March 2014
Pipe Grid
*************************************************************************************

Harrisburg High School Auditorium

Harrisburg, SD
Harrisburg School District – Jaren Guetter (605.743.2567)
January 2014
Add 6 Brickhouse Counterweight Linesets to existing rigging system, Add additional stage masking curtains, Add 48 circuit dimmer rack to existing theatrical lighting system, Add FOH lighting and data distribution plugstrip.
*************************************************************************************

Broadcast West Studio

Los Angeles, CA
Broadcast West Studio – Noe Vasqauez (310.923.0979)
January, 2014
Pipe Grid
*************************************************************************************

Evergreen State College

Olympia, WA
ORA Architects (206.625.0941)
Schwiesow Construction, Inc  (360.330.2005)
March, 2014
Performance Rigging Equipment and Accessories, Drapes and Track
*************************************************************************************

Huntington Library

San Marino, CA
Architectural Resources Group, Inc  (626.583.1404)
Bergelectric Contractors  (818.991.8600)
July, 2014
Lighting Control Systems, Lighting Fixtures
*************************************************************************************

Harrisburg North Middle School Auditorium

Harrisburg, SD
Harrisburg School District – Jaren Guetter (605.743.2567)
March 2014
Stage Curtains, Curtain Tracks, Motorized Projection Screen, Production Intercom System
*************************************************************************************

The Harbor Church

Hastings, MN
The Harbor Church – Joel Evermann (952 232-1704)
August 2013
Dimming system, Architectural Control, Lighting Distribution Equipment.
*************************************************************************************

Lincoln Community Playhouse

Lincoln, NE
Lincoln Community Playhouse, Morrie Enders (402.489.7529)   
September, 2013
11 each Counterweight Sets, 3 each Electric Sets Complete
*************************************************************************************

Aultsville Theatre, St. Lawrence College

Cornwall, ON
Perras Distefano Const. & Design Services, Frank Perras (613.938.7412)               
September, 2013
Replacement of Fire Curtain System
*************************************************************************************

Zellerbach Hall – University of CA-Berkeley

Berkeley, CA
Shalleck Collaborative   (415.956.4100)
University of CA Berkeley, Contract Admin.  (510.642.6273)
August, 2013
Replacement of 57 existing counterweight rigging linesets with Brickhouse counterweight rigging system and motorized rigging.
*************************************************************************************

Bakersfield College Performing Arts Center

Bakersfield, CA
BFGC-IBI Group Architecture Planning   (661.836.4300)
Landry & Bogan Theatre Consultants   (650.969.5195)
SC Anderson Inc., John Pellico (661.392.7000)
August, 2013
Pipe Grid, 36 each Brickhouse counterweight rigging sets complete.
*************************************************************************************

Agoura High School Performing Arts Center

Agoura Hills, CA
John Sergio Fisher & Associates, Inc. (818.344.3045)
SC Anderson, Inc. Lorna Fullerton (661-387-9317)
November, 2012
Counterweight Rigging, Tension Grid, ETC Prodigy Motorized FOH, Acoustical Drapes, Stage Lift, Shell, Lighting System
*************************************************************************************

Calabasas High School Performing Arts Center

Calabasas, CA
John Sergio Fisher & Associates, Inc. (818.344.3045)
SC Anderson, Inc. Lorna Fullerton (661-387-9317)
November, 2012
Counterweight Rigging, Tension Grid, ETC Prodigy Motorized FOH, Acoustical Drapes, Stage Lift, Shell, Lighting System
*************************************************************************************

Santa Barbara City College  

Santa Barbara, CA
John Sergio Fisher & Associates (818.344.3045)
Diani Building Group, Ken Lowthrop   (805.925.9533)
December, 2011
Replacement of existing counterweight rigging system, motorized line sets, Tension grids, motorized FOH, Acoustical Drapes, tracks
*************************************************************************************

San Joaquin Delta Community College (2 Theatres)  

Stockton, CA
John Sergio Fisher & Associates (818.344.3045)
San Joaquin Delta Community College, Rick Barton (209.954.5705)
November, 2009
Renovation of existing counterweight rigging system, fire curtain, Acoustical Drapes, tracks
*************************************************************************************

Saroyan Theatre   

Fresno, CA
Landry Bogan, Inc.  (650.969.5195)
City of Fresno, Mark Davis (559.621.1223)
August, 2008
Replacement of existing counterweight rigging system
*************************************************************************************

Agua Caliente Casino- Headliner Room   

Rancho Mirage, CA
Delawie  Architects (619.299.6690)
The Penta Group, Christopher Brooks,  (760.328.1465)
February, 2009
Furnish rigging and draperies, motorized room reduction system, Stage Extension platforms, chain hoists
*************************************************************************************